BUILDING CONSTRUCTION OBJ
01-10: ADABDAADCC
11-20: DCDBDCCAAC
21-30: DBDBCBAACB
31-40: DBBDBCCCCA
COMPLETED
═══════════════════════════
INSTRUCTION: ANSWER FIVE(5) QUESTIONS ONLY
(1a)
(i) Ridge board
(ii) Common rafters
(iii) Purlins
(iv) Wall plates
(v) Hip rafters
(vi) Valley rafters
(vii) Ceiling joists
(viii) Battens
(1b)
(i) Ridge board: This is a horizontal timber member fixed at the highest point of a pitched roof. It acts as a fixing point and spacer for the upper ends of the rafters, and it does not carry structural load itself.
(ii) Common rafters: These are inclined structural members that extend from the ridge board to the wall plates. They support the roof covering and transfer its load to the supporting walls.
(iii) Purlins: These are horizontal members fixed across the roof structure to support the common rafters and reduce their unsupported length. They strengthen the roof framework and transfer the load to the gable walls or struts.
(iv) Wall plates: These are horizontal timber members placed on top of the walls to receive and support the lower ends of the rafters. They help distribute the roof load evenly onto the walls.
═══════════════════════════
(2a)
(i) Brick trowel: This is a hand tool with a flat, triangular-shaped metal blade and a handle. It is used for spreading and applying mortar, lifting mortar and positioning bricks during bricklaying.
(ii) Spirit level: This is a measuring tool containing a small liquid-filled tube with an air bubble. It is used to check whether brickwork is horizontal or vertical.
(iii) Plumb bob: This consists of a pointed metal weight attached to a string. It is used to check the vertical alignment of walls and other structures.
(iv) Builder’s line: This is a thin, strong cord stretched between two points. It is used to guide the bricklayer in laying bricks in straight and level courses.
(v) Brick hammer: This is a hammer with a flat striking face and a chisel-shaped end. It is used for cutting, shaping and breaking bricks to the required sizes.
(2b)
(i) Excavating and earth-moving plants
(ii) Hoisting and lifting plants
(iii) Transporting (haulage) plants
(iv) Concrete production and placing plants
═══════════════════════════
(3a)
Setting out is the process of transferring the dimensions and positions of a building from the approved building plan onto the actual ground or site before construction begins, so that the building is located in the correct position and has the correct size, shape and level.
(3b)

(3c)

═══════════════════════════
(4a)
(i) Dead load.
(ii) Live load (imposed load).
(iii) Wind load.
(4b)
Dead load is the permanent weight of the structural components of a building. It includes the weight of walls, floors, roofs, beams, columns and other fixed parts of the structure. It is fixed in position and magnitude, and it can be estimated from the unit weights and dimensions of the materials used. It is continuously transferred through the structural members to the foundation and then to the ground.
═══════════════════════════
(5ai)
Removing vegetable soil:
(i) To remove organic materials such as grass, roots and decayed vegetation that may decompose and cause settlement.
(ii) To expose firm and suitable ground for construction and provide a stable base for the building.
(5aii)
Building hutments:
(i) To provide temporary accommodation for workers and site supervisors.
(ii) To provide temporary offices, stores and resting places for workers and the storage of construction materials and equipment.
(5aiii)
Soil investigation:
(i) To determine the nature, type and bearing capacity of the soil before construction begins.
(ii) To establish the suitable type and depth of foundation required for the proposed structure.
(5aiv)
Hoarding:
(i) To prevent unauthorised persons from entering the construction site and protect them from construction hazards.
(ii) To prevent theft of construction materials, tools and equipment by restricting access to the site.
(5b)
(i) Medical facilities: The company should provide healthcare services, first aid and medical treatment to workers in case of illness or workplace accidents.
(ii) Transportation allowance: The company should provide transport facilities or allowances to help workers travel conveniently to and from the construction site.
(iii) Accommodation: The company should provide suitable accommodation for workers, especially those who live far away from the construction site.
(iv) Paid annual leave: Workers should be given paid leave to rest and attend to personal matters without losing their regular salaries.
(v) Canteen and feeding facilities: The company should provide affordable meals and clean drinking water to ensure that workers are properly fed and hydrated during working hours.
═══════════════════════════
(6)
(i) Bearing capacity of a soil: This is the ability of the soil to safely support the loads imposed on it by a building or other structure without failing or undergoing excessive settlement. It is usually expressed as load per unit area, in kN/m².
(ii) Differential settlement: Differential settlement occurs when different parts of a building’s foundation settle by unequal amounts. It may cause cracks in walls, floors and other structural components, and can lead to structural damage.
(iii) Even settlement: Even settlement occurs when all parts of a building’s foundation settle uniformly by approximately the same amount. It generally does not cause serious structural damage because the building moves down evenly.
═══════════════════════════
(7a)
(i) Foundation settlement: This occurs when the soil beneath a building compresses or moves under the weight of the structure. Unequal settlement of the foundation can cause cracks in walls, floors and other parts of the building.
(ii) Thermal movement: This occurs when building materials expand due to an increase in temperature and contract when the temperature decreases. Repeated expansion and contraction can cause cracks and distortion in building components.
(iii) Moisture movement: This occurs when building materials absorb moisture and expand or lose moisture and shrink. Repeated swelling and shrinkage can cause cracks, warping and other forms of damage to the building.
(7b)
A parapet wall is a low protective wall built along the edge of a roof, balcony or terrace to prevent people from falling, while a roof gutter is a channel fixed along the edge of a roof to collect and carry rainwater away through downpipes. Also, a parapet wall is a solid structural element built of brick, block or concrete, whereas a roof gutter is a drainage component usually made of PVC, galvanised steel, aluminium or concrete.
═══════════════════════════